中西团队 · 负荷情况

截至 2026-09-18 · 距 H2 结束 (2026-12-31) 还剩 71 个工作日

窗口团队产出调研抵配置抵上线抵完结抵上线#完结#终止#朱尧党皓高严梁德晶
2026474.253.4149.1131.1140.758608181.4160.3118.314.2
2025921.288.2281.3270.3281.41121154284.8444.2192.20
202456164.4137180.4179.265640272.3277.311.40